Gasteig Isar Philharmonie
Services: 3D CAD Planning · Modular Architecture · Technical Development
Genre: Temporary Structure, Concert Venue
Location: Munich (Germany)
Year: 2020 / 2021, Opening April 2021
Client: Gasteig // Nüssli Schweiz AG
Architect: gmp architects, Berlin
PROJECT OVERVIEW
3D general planning of the concert hall for the Isarphilharmonie in Munich - a modular, timber-based structure designed for temporary use with high acoustic and architectural standards. The project combined sustainable materials with cost-conscious construction and had to be delivered within a challenging timeline. I was responsible for the full 3D coordination of the concert space (“building within a building”), ensuring design integrity, precision and acoustic integration across all trades.
ROLE
Led the 3D master planning of the concert hall structure, including spatial layout, acoustic geometry, and modular timber construction. Oversaw technical alignment across trades, ensured buildability in a high-precision environment, and translated complex design intent into executable CAD models
KEY ACHIEVEMENTS
Delivered detailed CAD models under time pressure, ensured seamless trade coordination, and supported cost- and resource-efficient execution.